News About Town: Tonight the Board of Commissioners will consider entering into contract with Bloc Design for streetscape improvement design work for the downtown portion of Trade Street through North End and a portion of the downtown area of John Street. The cost for design work has been estimated by Bloc Design at $37,000 and, if approved, may not exceed $41,250. Their suggestions might include sidewalk improvements, traffic calming measures, and a cohesive design. The planned design will function as a schematic for future reconstruction of sidewalks and aesthetics within the study area.
Previously the Board hired McGill Associates for a streetscape design. The 2016 renderings and document detailed designs and improvements that projected up to twenty years in the future. It is unclear why another design is being sought now.